Drivers are being reminded of a closure to a section of the A70 near Ochiltree this week.
The Ayrshire Roads Alliance will be carrying out essential road resurfacing works on the road, with preparatory works set to begin on Wednesday, November 29 and Temporary Traffic Signals in place.
These are set to be in place from 8am to 5pm until Friday, December 1.
Two weekend road closures will then be in place on December 2, 3, 9 and 10 to allow resurfacing work to take place.
READ MORE: 'Collapsing road' near Cumnock earmarked for repair, say roads bosses
The road is set to be fully closed between Ochiltree Main Street and Mote Toll.
The road will be closed from 8am each Saturday and will re-open no later than 8pm each Sunday, when signed accordingly.
Works will involve removing sections of the existing road surface, deep patching, laying a base course, adjusting ironware, laying a new surface course and renewing the associated road markings and studs.
READ MORE: Patient taken to hospital following crash near Dumfries House
An alternative route for Non-High Sided Vehicles will be signed via A70 to Cumnock, A76 through Mauchline to A719 at Crossroads to A77 at Sandyford Toll to A77 Holmston Roundabout, before re-joining the A70 through Coalhall towards Ochiltree and vice versa. To avoid the low bridge at Coalhall, High Sided Vehicles will be diverted at Coalhall following the B730 Drongan, B7046 Sinclairston, U728 Glenconner before re-joining the A70 at Mote Toll and vice versa.
Electronic Variable Message Signs will be placed on the A70 to inform the travelling public of each weekend road closure.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here